Andrews Federal Bus Garage in Washington, D.C.

Contractor: Hensel Phelps
Tons: Approximately 1130 tons of structural steel, 650 tons of steel joist
Square Footage: Approximately 380,000

Washington, D.C.

Steel, LLC is excited to be a part of the construction of this new infrastructure for WMATA (Washington Metropolitan Area Transit Authority) in collaboration with Hensel Phelps.

The steel-framed structure houses space for both administrative personnel as well as warehouse / garage areas for buses to be maintained and stored.  The structure is comprised of steel columns with long span joists and pre-fabricated metal trusses.  

The project also includes extending site utilities from the site entry to the added buildings, a Maintenance Building (one-story, high bay) connected to an Operations Building (two-story) with outlying buildings (one-story) for bus wash and bus fueling.  Construction is set to start in January 2017. 

Categories: Government, Mid-Atlantic